i
General
The properties panel is displayed on the right side of the activities modeler, where the first tab corresponds to general information.
Properties
Name
Activity name. It refers to the action performed by the activity.
Type
Defines the type of activity.
Priority
Indicates the activity priority. Possible values are URGENT, HIGH, MEDIUM, LOW.
The user can display this property in the to-do list and use it as a sort criteria, according to their preference.
Description
Description of the activity that can be used as an online manual.
The user who executes the activity can see it by clicking on the icon .
Comment
In this field, the designer can document in detail what the task consists of.
Allows to set the Maximum Duration and the Average Duration of the activity.
When the execution of the activities begins, these durations are transformed into a maximum due date and an expected expiration date, respectively. The activity due date calculation is made in different ways, depending on whether the definition of maximum duration is made according to duration or due date.
In the case show or in the tasks show, the due date and time of the task are displayed and in addition, on these durations, alerts can be set.
Edits the maximum and average duration.
●By duration
A deadline in days, hours, minutes and seconds is reported.
●By due date
A date type variable is selected from a form associated with the process, using the wizard icon .
In the activity execution, such variable value is used as due date. If this variable value is modified, the due date of the activity is automatically modified.
Actions
The icon is used to confirm the modifications made in the properties panel.
The icon is used to close the properties panel, if it was not previously saved, changes are discarded.